Price List

The prices below are correct at the time of writing but may be subject to change depending on projects undertaken.

If you need assistance with something and cannot find it on this page, please get in touch with us to talk about your requirements. We can always provide you with a tailored quote and project outline when needed.

SERVICE RATE
WEEKDAY (Mon-Fri 8am to 5pm)
EVENING & WEEKEND (Mon-Fri 5pm to 8pm)
Friday & Weekends 8pm to 8am
Call Out (Includes 1st hour)
70
105
185
Boiler Service*
70
105
Unvented Cylinder Service*
70
105
Combined Gas Boiler & Unvented Cylinder Service
130
195
Landlord's Gas Safety Inspection
60
90
Combined Gas Boiler Service & Gas Safety Inspection
120
180
Powerflushing up to 4 Radiators
350
525
Powerflushing Each Additional Radiator After 4
40
60
Fit Magnetic Filter
160
240
New Radiator Installation
140
210
Remove Radiator
120
180
Re-Install Radiator
120
180
TRV Installation
120
180
Fit Extra TRV
40
60
Gas Fire Service
80
120
Gas Hob Installation
90
150
Gas Cooker Installation
80
120
Basin Tap Change
90
135
Bath Tap Change
120
180
Unblock Drain/ Toilet
90
135
Shower Mixer Valve Change
90
135
Power Shower Installation
160
240
Outside Tap Installation (up to 1m pipe length)
90
135
Replace Stop Cock/ Float Valve/ Gate Valve
120
180
Hot Water Cylinder Installation
CALL
CALL
Immersion Heater Replacement
160
240
Air Conditioner Service Per Unit (indoor & outdoor unit)
90
135
Air Conditioner Service Per Extra Indoor Unit
40
60

* Additional Charge may apply if strip down is required or material change is required.

Prices quoted are for work done in Milton Keynes only.

Hourly Rate: Minimum time per appointment is 1 hour after which we will charge in half-hourly increments. All rates exclude the cost of materials and are subject to VAT at the current rate.

Free No obligation quotes/ estimates: We can provide free written estimates for major works. Major works include boiler installations, bathroom refurbishment, and whole system upgrades.

Materials: Materials supplied by SEAMSERV LTD will be charged at trade price plus 10% mark up.

Detailed report: We will complete a detailed report, which will capture precisely what was done during our visit so that you have a formal record of the project and of the associated costs.

Invoice: An invoice will always be produced clearly showing a full description of work carried out – time started/time finished, a breakdown of the cost of labour and materials used.

For larger projects, 65% upfront payment is required before the work commences and the 35% balance paid upon completion and handover

Payment: Payment is to be made in full to the engineer once invoiced. We accept credit/debit cards and bank transfers for larger pre-quoted works.